NEW BATHROOM

When we bought the house there was a room on the east side of the kitchen. It was heated by an electric monitor heater and primarily used for laundry, storage, and had a large chest-freezer. It had wood paneling and a hatch that went to the basement and another that went to the attic. There was a fiber tile ceiling and linoleum floor stapled down over a plank sub-floor.
When we moved in we got rid of the chest freezer and moved the laundry machines to the basement. We christened the area the 'Mudroom' and it was an off-and-on storage area for things as we did renovations on the house. About two years ago I started chipping away at making the space usable, which not only included the mudroom, but the area above and below as well. The first project to be done was the basement, because it was the easiest. Next was making a functional second bathroom (sink and toilet) which was completed about a year ago, but not finished... just functional.
About a month ago I got the bathroom finished enough. There are still a few bits and bobs I want to do, but for the most part it is complete. Toilet, shower, sink, tile, lights, shelves, cabinets, and the rest.

We also had the outer walls insulated, new electric and plumbing, and new windows along the way.
We did everything ourselves except run the plumbing.
Tah Dah!